Solution
Cree Edge™ parking, security and area luminaires were installed in a new parking structure, resurfaced parking lots and new campus streets. The four-level, 419-stall parking structure is illuminated with 134 pendant-mount luminaires. There are 42 parking structure luminaires on three floors and 16 poles with area lights on the upper deck.
Ward Komorowski, director of facilities and building services for JCI, oversaw the renovation. He hired Leedy and Petzold Associates LLC, an electrical engineering design firm, to plan sustainable lighting.
Leedy & Petzold designed the application to meet LEED requirements and City of Glendale lighting ordinances. Restrictions on light levels and mounting heights were considered. Principal James Haug, P.E., compared 175-watt metal halide fixtures to 118-watt Cree® area luminaires and calculated a 45 percent energy savings for the parking lot lights alone.
“We looked at other LED solutions but were convinced the Cree® luminaires would offer a superior solution because of a thermal design that handles the heat better and a more advanced optical design,” said Haug. “We are confident that the Cree® solution will provide worry-free operation for the next 12 plus years. The visibility is as good as or better than the metal halide provides.”